Rate Card · OC & LA County

Commercial Landscaping Price List — Orange County

We publish our commercial rates because property managers and HOA boards need real numbers to budget against — not a promise to “call for pricing” three weeks before the reserve study is due. Below are the labor, plant material, irrigation, drainage, and construction rates Greenhouse works from across Orange County and Los Angeles County.

Most landscape contractors treat pricing as something you earn access to after a site visit and a follow-up call. That is fine for the contractor and useless for the manager holding a spreadsheet in August, trying to work out whether replacing forty 5-gallon shrubs and a failed mainline belongs in this year's budget or next year's. Real unit costs let a board do arithmetic before it takes a meeting.

Two things these numbers are not. They are not a quote — a scope with quantities, access notes, and site conditions is what produces a quote, and we put that in writing. And they are not a menu you have to order from line by line: most of this work reaches properties through a maintenance contract, where the routine is covered and these rates apply to the extras. What they are is an honest starting point, published so you can budget without waiting on us.

Labor & Professional Services

Hourly crew and technician rates. These are the numbers behind time-and-materials work orders and anything scoped outside a standing maintenance contract.

Labor & Professional Services rates
Item Price Unit
General labor $45.00 Per hour
Supervisor $65.00 Per hour
Irrigation technician $70.00 Per hour
Spray application $70.00 Per hour

Plant Material

Container sizes as nurseries sell them. Box-tree pricing is the line that most often decides whether a common-area replanting happens this fiscal year or next.

Plant Material rates
Item Price Unit
1-gallon plant $14.00 Each
5-gallon plant $36.00 Each
15-gallon plant $160.00 Each
15-gallon tree $260.00 Each
24-inch box tree $465.00 Each
36-inch box tree $1,180.00 Each
48-inch box tree $2,700.00 Each
Ground cover $36.00 Per flat
Sod $3.00 Per sq. ft.

Irrigation Repairs & Installation

Repair and new-installation pricing for the components that fail most often on HOA and commercial systems — mainlines, laterals, valves, and heads.

Irrigation Repairs & Installation rates
Item Price Unit
Main line repair * $400.00 Flat rate
Main line installation $15.00 Per linear ft.
Lateral line construction $3.65 Per linear ft.
Sprinkler head $47.00 Each
Nozzle $12.00 Each
Valve installation * $345.00 Flat rate
Valve repair kit * $105.00 Flat rate

Drainage, Equipment & Construction Components

Drainage installation, mobilized equipment, and the hardscape and irrigation components that get specified by name in a scope of work.

Drainage

Drainage, Equipment & Construction Components — Drainage rates
Item Price Unit
Drain installation $15.00 Per linear ft.
Catch basin $115.00 Each

Equipment & Operations

Drainage, Equipment & Construction Components — Equipment & Operations rates
Item Price Unit
Truck and operator * $120.00 Flat rate
Equipment, operator, and trailer * $365.00 Flat rate

*Unit basis varies by project. Contact us to confirm rate structure for your scope.

Construction & Irrigation Components

Drainage, Equipment & Construction Components — Construction & Irrigation Components rates
Item Price Unit
Concrete $17.50 Per linear ft.
Gate / ball valve * $225.00 Flat rate
Quick coupler * $400.00 Flat rate
Flow sensor * $600.00 Flat rate
Tree bubbler * $34.45 Flat rate
Flush valve * $45.00 Flat rate
Relief valve * $200.00 Flat rate
PVC sleeve $12.00 Per linear ft.
Wire conduit $7.75 Per linear ft.
Controller * $800.00 Flat rate
Wall enclosure * $500.00 Flat rate
Backflow preventer * $1,500.00 Flat rate
Hunter PGP-ADJ sprinkler head $65.00 Each
Core drilling * $45.00 Flat rate

How these rates show up on a real property

A rate card reads like a parts list until you attach it to a property. On a 200-unit association in Mission Viejo, the lines that actually move the budget are irrigation and plant material: a mainline break under a slope path, a dozen heads lost to landscape traffic each quarter, and the 24-inch box trees the board has deferred for two seasons. On a business park in Santa Ana, it is more often drainage and concrete — the walkway that ponds every winter, the catch basin nobody has cleared since the building changed hands.

That is why unit pricing and contract pricing answer different questions. Ongoing care of common areas, turf, shrubs, and slopes is scoped as commercial landscape maintenance on a monthly contract, and the rates above cover what falls outside it: repairs, replacements, and improvement projects your board approves separately. Associations running the same arrangement on the HOA side typically fold irrigation into the routine, since HOA maintenance that skips the sprinklers is the version that gets expensive in July.

Irrigation is the category boards ask about most, and it has its own pages with the detail this one leaves out — HOA irrigation repair for common-area and slope systems under association management, and irrigation repair in Orange County for commercial sites generally. Both start the same way: the on-site inspection is free, every zone gets run and checked, and you get the findings in writing whether or not you hire us. The repair is quoted after that inspection, because until a system has been fully walked, nobody honestly knows which of the lines above apply.

Questions on any line item, or want a scope priced against it? Call (714) 415-2315. Greenhouse Landscaping & Maintenance Inc., CSLB #1136097, licensed and insured.

Pricing is provided as a commercial reference and may be adjusted based on project conditions, access, quantities, material availability, and the approved scope of work. A written estimate will confirm final project pricing.

Have the numbers. Now get the scope.

We'll walk the property, price the work against this list, and put it in writing your board can vote on.

Call or Text (714) 415-2315
Call or Text — (714) 415-2315